Chicheng economic development area of Hebei province was started to be built in May 2012 and was approved by the People's Government of Hebei Province in November 2014 as "Provincial Economic Development Area". The total planning area of the development zone is 7.33 km2, which is divided into East and West areas. The East Area (Chicheng Area) is located in the east side of the county, with a planned area of 5.07 km2; the West Area (Longguan Area) is located in Wujiayao Village, Longguan Town, with a planned area of 2.26 km2.
The main methods used in this project are data collection, field investigation and indoor analysis. First of all, we extensively and deeply collect the relevant data of the geological, land, meteorological, hydrological, environmental and other relevant data of the work area. Meanwhile, we also timely analyze and sort out the work plan, make the work plan, and revise and implement it after the review of the expert review meeting, and continuously improve and adjust the next work according to the existing data in the investigation process. The field work was carried out in accordance with the relevant specifications and the approval requirements of the scheme, with accurate original data and detailed contents. In the whole process of the project, the quality standards of our company's comprehensive management system are strictly implemented, and various quality assurance measures are fully implemented in accordance with the current national and relevant industry specifications and the owner's requirements, so that the project quality has been effectively controlled.
Through the review of the expert group, it is determined the report meets the requirements of the project and specifications, and achieves the expected work objectives, which can be used as the basis for the construction company to prevent and reduce geological disasters in engineering construction.