This project is located in Hedong District, Tianjin. Entrusted by Tianjin Binhai Power Supply Branch, our company has undertaken the following work contents: (1) the root control survey meeting underground cable survey and 1:500 strip topographic Map Survey; (2) field surveying and mapping of underground power cables; (3) the 1:500 strip topographic map survey within about 20 meters on each side of the cable path.
The project was started in January 2020 and completed in December 2020, a total of 1,395,191 meters of cable survey was completed for this project, with a total of 129 completed survey items. In January 2021, we completed the data compilation and submitted all the results, and successfully passed the acceptance of the owner. In the project, we conducted 1:500 strip topographic map survey for about 20 meters on each side along the cable and drew cable map to provide data information to meet the management system.
During the construction, the technicians strictly implemented the specifications, rules and technical plans, and no quality accidents occurred, no safety accidents occurred and no complaints were received from the environmental management department and related parties.